In this warm social family, every act of kindness is a priceless treasure. Jiangsu Lejian Construction Co., Ltd., together with caring individuals from all walks of life, jointly participates in the 2024 charity event for voluntary blood donation and hematopoietic stem cell collection!
In the bright spring of March, as spring returns to the earth, on the occasion of the 113th International Women's Day, Xu Guang, Vice President of Lejian Group, organized female colleagues to carry out the "Goddess Festival • Children's Welfare Home Charity Event." Lejian brought daily necessities, milk, and snack gift packs to the children, played with them, inquired about the children's health and study conditions from the welfare home staff, and sincerely conveyed care to the children.
Aegis factory building, Class A warehouse, finished goods warehouse, monitoring room, and fire water pool. Total construction area is 26,195.5㎡, factory building area is 21,076㎡, finished goods warehouse area is 4,355.5㎡, Class A warehouse area is 41㎡, monitoring room and fire water pool area is 722㎡.
The total construction area is 96,886 square meters, with a frame structure, eleven floors above ground, pile foundation, civil engineering, and electrical and plumbing installation works.
Commercial service building project, civil engineering, and installation (including water and electricity, fire protection, ventilation and smoke exhaust, etc.), with a construction area of 39,343.93 square meters, eave height of 51.45 meters, frame-shear structure, full slab foundation, eleven floors above ground, and one floor underground.
Follow Us
Lecons Construction
Lecons Network
Copyright © 2025 Lecons Group Co., Ltd.. All Rights Reserved